BOD · TAO Sawgrass · 2026
Two presentations for review at this week's meeting. Click either card below to open the full deck. From inside, a link in the top bar returns here.
Item 01
Refurbishing the operating panels across all nine elevators. The Board chooses between two finish directions — engraved metal numerals or high-contrast black numerals — with the full spec, cost breakdown, and ADA review.
Item 02
Revisiting the dark walnut wrap currently in PE6. Three new 3M DI-NOC architectural film options under consideration, all rendered in the same cab for side-by-side evaluation. Includes the as-built state today.